LAUSD Fire Alarm Renovations

Installed new automatic fire alarm system, disassembled & disposed old alarm.

           Plainview Elementary School

           Stevenson Middle School

           San Fernando Elementary School


Vinedale Elementary School

Modernization of 3 buildings with access / compliance and electrical upgrades

to accommodate new spatial organization and bring structures up to code. Installation of new automatic fire alarm system throughout the entire campus. ADA restroom upgrades, new rooftop HVAC system, roofing, new cabinetry. Construction of “Wonder of Readings” library center to include stage, seating platforms, shelving and storage.


Belvedere Middle School

Complete auditorium renovation including new fixed audience seating, new stage lighting and rigging system, removal and replacement of existing ceiling light fixtures (30 ft height) and new wheel chair lift at stage. Full electrical upgrade (including new switch gear & transformer, battery back-up), theatrical lighting and sound control system. Bathroom upgrades for ADA compliance.

HOMEindex.html
PHILOSOPHYAVA_Builders,_Inc._Philosophy_818.989.3888.html
SERVICESAVA_Builders,_Inc._Services_818.989.3888.html
PROJECTS
CLIENTSAVA_Builders,_Inc._Clients_818.989.3888.html
CONTACT USAVA_Builders,_Inc._Contact_Us_818.989.3888.html
CAREERSAVA_Builders,_Inc._Careers_818.989.3888.html

LAUSD Fire Alarm Renovations

Installed new automatic fire alarm system, disassembled & disposed old alarm.

           Wadsworth Elementary School

           Blythe & Cantara Elementary Schools

           Erwin Elementary School

           Dyer Elementary School


Dorsey High School

Converted regular classroom into a full Chemistry laboratory with new

plumbing, cabinetry, chemical science equipment, and lighting.


Weemes & Normandie Elem. Schools

Constructed “Wonder of Reading” library with new cabinetry, lighting,

stage, platform seating, flooring, shelving and storage.


Sutter Middle School

Built ADA compliant outdoor amphitheater with new irrigation, landscaping,

and seven new 30 ft outdoor light fixtures.


North Hollywood High School

Installed new football stadium bleachers and upgraded/spatially reconfigured restrooms for ADA compliance.

Kenmore Apartments

Reconstructed the foundation and reinforced the structural integrity of a 48 unit apartment building.


Bob Hope Airport

Designed and installed the new front tower, ceramic tile, and outdoor welcome signs. Remodeled all restrooms for ADA compliance.  Obtained federal security clearance.


City of South Pasadena

Remodeled South Pasadena City hall to meet ADA compliance by updating restrooms, cabinetry, lighting, flooring, and painting.


Highway Patrol Facility

Renovated the facility with new framing, ceramic tile, and restroom upgrades for ADA compliance.

$350,000

$728,000

$538,000


$758,000








$1,348,000















$512,000

$909,000

$642,000

$320,000


$337,000




$237,000




$412,000




$866,000

$800,000




$580,000





$120,000




$45,000

AVA Builders, Inc. © 2009